These photos are of 1/2 a platform under construction. All chequer plate flooring is fully sealed welded and folded at the edges to create a very clean arrangement.
Another trick feature is the tapped bars welded into both sides of the SHS so as to bolt the handrail on and not provide an entry for liquids to eventually leak into the SHS over time.
Bracing is set on the diamond to eliminate flat surfaces for dust and contaminants and a place to settle. Hope to be done before Christmas – will post an update
All built from scratch with pride and care in our Minto workshop.
Contact us for a bespoke system to suit your specific needs