Custom Fabrication of Large Tanks

A nice fabrication job with a complex install completed on the last days of 2024.

7 mild steel tanks were removed and replaced with stainless steel tanks along with a gantry walkway and connecting pipework.

The tanks were too heavy to remove through the roller door, so the roof had to be removed, the sprinkler system disconnected and removed, and a larger than necessary crane was required due to there being an underground tank located just outside the building envelope.

All completed very successfully much to the extreme delight of the customer.

All stainless steel fabrication work carried out with pride and care in our Minto workshop.

For more information see https://stainlesstanksandmixers.com.au/products/silos-tanks-vessels-vats/

Contact us for a bespoke system to suit your specific needs.